EN
Contact Us

PRESS AREA
AIC India received the order for the upgradation of the speed control system for the Alloy Steel Plant
In December 2022 AIC India received an order from one of the Alloy-Steel manufacturers in Southern India to overcome the problems with respect to existing rolling mill control systems namely.


Read more
Supply of control equipment for a kiln charging overhead crane at the Pittini Group.
Verona Galtarossa melt shop of the Pittini Group has received the kiln charging bridge crane with new equipment/control equipment from AIC in cooperation with Carpenteria Meccanica Almici SpA.


Read more
Roughing mill revamping at Ovako Hällefors in Sweden.
AIC in partnership with Pomini Long Rolling Mills has signed a contract with the leading European manufacturer Ovako AB for hot rolling mill revamping at its facility in Hällefors (Örebro, Sweden).


Read more
AIC India received order for revamp of existing shear control systems.
In December 2022 AIC India received the order from one of the Stainless-Steel manufacturers in Western India to overcome the problems with respect to the control systems of Existing Pendulum Shear and Divide shears.


Read more
AIC South America completed the modernization at Gerdau Cosigua
AIC South America team has revamped Mill 2 in the Brazilian plant Cosigua for Gerdau Group, intervening on two strands for finishing blocks.


Read more
Successfully Factory-Acceptance Test for Columbia City and Jacksonville steel plants in North America
In weeks 46-47 of 2022, the AIC North America team successfully granted Factory-Acceptance Tests for two strategic projects that will be completed in the early part of 2023.


Read more
AIC India received the order for its production organizer suites
In September 2022 AIC India received an order for its production organizer suite for a customer in South Africa, a comprehensive range of solutions to improve the overall efficiency of the steel plant.


Read more
AICNA for rougher mill stands drives upgrade at Gerdau Whitby
The AIC American team has led the restart at the Whitby structural mill in Toronto, after the drive cabinet and PLC/HMI modifications for the replacement of the Rougher DC drives and the conveyors 2H-3H AC drives.


Read more
Choose the year
2023   2022   2021   2020   2019   2018   2017   2016   2015